Our TCL Group colleagues, TCL were asked to assist in the project due to their experience in delivering multi-service works. Because of their design capability and use of their own supplier, TCL’s teams set out to design, supply and install three new play areas for the local children.
Plymouth City Council carried out a survey to establish the local community’s priority for the development of their public open space. Our team then produced six 3D designs based on the information provided from the survey and the designs were to be used for public consultation. The final design consisted of three play areas: an under 8’s area, an over 8’s areas and a multi-use games area (MUGA).